TA024/TA124 Top Loading Arms
Product Category: Top Loading Arms
Product description
● The overall design is customized to meet site conditions, ensuring the loading arm can connect to any tanker within the specified envelope.
● Depending on the characteristics of the product, a telescopic drop pipe can be used to ensure submerged loading and reduce static electricity. For topside loading, a deflector or a 45° angled opening can be installed on the drop pipe to minimize splashing and impact on the tanker.
● The loading arm is easy to operate. The outboard arm balancing system and locking mechanism ensure easy operation and locks the outboard arm in the loading position.
● An optional level switch is available for loading, providing a signal to the system to prevent overloading.
● An optional low-level sensor is available for unloading, providing a signal to the system to prevent the unloading pump from running dry.
Product parameters
● Applications: Open Top Loading
● Applicable Products: Oils, Chemicals, etc.
● Nominal Diameter: DN50 to DN200
● Design Temperature: -40°C to 180°C
● Design Pressure: 0.1 to 1.6 MPa